• Sunshine@piefed.caOP
    link
    fedilink
    English
    arrow-up
    27
    ·
    5 days ago

    electric trains not really viable.

    You’re trolling as Europe, China and Japan are covered in electrified lines. They work phenomenally.

    Hydrogen trains are just a scam meant to keep fossil fuels in use longer.

    all those fancy rails are just a maintenance nightmare, and much more energy intensive.

    They’re actually cheaper to service. You’re just making up that last part.

    Siberia has an electric railway and it’s doing fine.

    • Andrii Zvorygin@helpos.ca
      link
      fedilink
      arrow-up
      3
      arrow-down
      3
      ·
      4 days ago

      Alright you convinced me if we follow their design we can do it.

      On the Trans-Siberian Railway, the electricity is not in the rail itself. ✔ How it actually works Power comes from an overhead wire (called a catenary) The train has a pantograph on top The pantograph presses upward and draws electricity from the wire The steel rails are used as the return path (ground)

      • Sunshine@piefed.caOP
        link
        fedilink
        English
        arrow-up
        6
        ·
        4 days ago

        You know what I mean by electrified rails of course it’s connected overhead.

        • Andrii Zvorygin@helpos.ca
          link
          fedilink
          arrow-up
          1
          arrow-down
          3
          ·
          3 days ago

          Okay yeah if we do it Siberian style that is proven method so should be fine for Canada, which is much smaller and warmer country.

        • Andrii Zvorygin@helpos.ca
          link
          fedilink
          arrow-up
          1
          arrow-down
          3
          ·
          3 days ago

          Fair enough using that overhead wire system apparently can scale economically to thousands of kilometers and already has in Siberia. If we follow that model for upgrading existing Canadian rail: Single track: about C$100 to 120 million per 100 km Double track: about C$180 to 220 million per 100 km Those are good hardware-heavy corridor numbers for wire, poles, substations, and power hookup on a reasonably straightforward existing alignment.