• AutoTL;DRB
    link
    fedilink
    English
    38 months ago

    This is the best summary I could come up with:


    “My voice is shot after so much shouting,” said a triumphant Raul Torres, chief executive of PLD Space, shortly after the launch.

    A second attempt in June failed when umbilical cables in the avionics bay did not all release in time, halting the lift off as smoke and flames spewed from the rocket.

    Competitors lining up to join the race to launch small payloads include companies in Scotland, Sweden and Germany.

    In July, the last launch of Europe’s largest rocket, the premier Ariane 5 space launcher, took place at the European spaceport in Kourou, French Guiana.

    Europe has until recently depended on Ariane 5 and its 11-tonne-plus capacity for heavy missions, as well as Russia’s Soyuz launcher for medium payloads and Italy’s Vega, which is also launched from Kourou, for small ones.

    Russia halted access to Soyuz in response to European sanctions over the invasion of Ukraine, the upgraded Vega-C has been grounded for technical reasons and Ariane 6 is delayed until next year.


    The original article contains 449 words, the summary contains 164 words. Saved 63%. I’m a bot and I’m open source!